Monday, May 11, 2009

Re-assembley close

I worked on the wiring, handlebars, grab rail, and controls today. I re-assembled as much as I could. It started up, but the fuel line is still leaking, so I need to work on that as soon as the fuel kit gets here.

The bike is running very rough, but might be getting close to selling.

I need to install front/rear turn signals, and wire them up, put new tires on, and then the bike will need to be tuned.

Low beam light needs to be wired, horn, high beam, start button, and kill switch work.

From 1973 Honda 750K


From 1973 Honda 750K




1 comment:

  1. Great update on the re-assembly process! Once everything is fixed, make sure your vehicle is in top condition by checking with this reliable tyre repair Dubai service.

    ReplyDelete